/

Upgrading Works Underway: Pathein-Shaw Pyar-Chaungtha Road upgraded

30 December 2024
50453
2024-12-30 09:14

Upgrading works are underway along the road connecting Pathien and Chaungtha in Ayeyawady Region.

On Sunday, Deputy Minister for Construction U Win Pe inspected the progress of road upgrading works by visiting the site. The upgrades include the construction of cycle lanes and pedestrian lanes on both sides of the road, asphalt paving, and embankments along the road section. The Deputy Minister instructed to carry out constant maintenance works to ensure the long-term durability of the facility.

-- End --