/

Inspection: Union Minster For Construction Continues Inspection In Ayeyawaddy Region

13 August 2019
10579
2019-08-13 11:19

Union Minster for Construction U Han Zaw continued his inspection in Ayeyawaddy Region.

At the Pathein Bridge No.2 construction site, the Union Minister heard report on the construction project and process and called for quality construction. The Union Minister also inspected the construction work. The Pathein Bridge No.2 over the Ngawun River connects the city of Pathein and the wards west of the Ngawun River. The steel reinforced concrete bridge is designed to be 2380-feet long and 38-feet wide.

The Union Minister continued his inspection trip to Pathein-Kankone-Myinkaseit Road maintenance and Panmawati (Myinkaseit) Bridge.

At the Labutta (Pinlallay) Bridge upgrade site, the Union Minister heard report on the upgrade process replacing the suspension part with HS 25 Load Class Steel Box Girder. He gave guidance and inspected the upgrade work. The Labutta (Pinlallay) Bridge is 1,300-foot long and 30.6-foot wide.

On the same day, the Union Minister inspected Myaungmya-Eainme-Pantanaw Road maintenance.

-- End --